Newly installed trellis rows with young vines establishing; one worker walks the site under overcast Ashland skies.
Field notes
The journal.
Tasting room mid-gut: ceiling stripped to insulation, ladder in frame, furniture pushed aside during renovation.
Steel stud framing and construction debris mark an early build-out phase at the Ashland facility.
Construction underway on the production space build-out, scissor lift and steel framing visible.
Steel staircase and forklift inside the winery build-out — construction phase, not for public use.
Metal stud framing goes up against the CMU wall — build-out in progress at the Resistance production space.
Barrel room event setup viewed from the mezzanine, tables dressed and staged ahead of a tasting.
Barrel room set for a seated tasting of the 2018 Syrah, shot from the mezzanine before guests arrived.
Chalkboard menu at Resistance Wine Co. documents current pizza, pasta, and small-bites offerings with sold-out callouts.
The Allium Wood Fired Pizza food truck, unaffiliated with Resistance Wine Company, parked at an unidentified location.